Variable Speed Limited Signs Re-installed

As part of Transurban’s T2K Project, Mi Electric removed and re-installed Variable Speed Limit Signs above the Gateway Bridge northbound lanes. These works utilized our crane truck and both our 14-metre insulated elevated work platforms (EWPs). Works were done at night to minimize traffic disruptions.